The bathroom is a room with special states: high humidity, humidity differences. That’s why making repairs in the restroom, you need to clearly plan the whole working process, to think about the sequence of measures to be performed. Within the following article, you will learn where to begin the fix in the restroom and what kinds of work ought to be carried out with your hands. Step-by-step directions for toilet repair
Stage 1: Establishing a strategy and picking a design solution.
Fix in the toilet can be of two types:
- Unplanned, spontaneous, arising from the will of unforeseen circumstances. By way of instance, in case of a pipe burst, flooding with neighbors.
- Planned, that is either capital or cosmetic. It requires preparation, serious monetary investment and time.
Begin repairs at the toilet is to find out the plan, inside. Think through the last detail, what’s going to be the room, pick a colour. Pastel colours are traditional, as well as a blend of blue and blue, or peach with beige.
Begin repairs in the bathroom is to determine the vsyakuhnya.ru plan, interior design. Think in detail, what’s going to be the room, select a colour. Pastel colors are thought to be traditional, in addition to a mixture of colors.
The next point is the choice of facing substance. Usually, finishing at the bathroom is performed with vinyl, porcelain tiles, mosaic, plastic panels. Check the plumbing, whether it ought to be replaced. If needed, pick an appropriate option. Proceed to the measuring function: quantify all sides, figure out the area of the area. Based on these information, we mark the location of these plumbing fittings.
Measure 2: the choice of sanitary fixtures and material for finishing.
It’s important to understand that the purchase of sanitary ware precedes the planning stage, rather than vice versa. This usually means that first we develop a design project, make a plan, then go to the shop. Another thing – you should specify how big your favorite plumbing fittings and check the plan, whether it matches.
It’s necessary to see that the cost of plumbing fittings is completed by a planning period, rather than vice versa. This means that first we create a design project, create a plan, and then go to the store. Another one
In terms of materials for completing, it is better to get them immediately for the whole repair cycle, and that then you will not be distracted if something was missing. Do not forget about preparing the necessary tools.
Measure 3: dismantling plumbing and tiling.
Once All of the preliminary work is done, move on to the beginning of the work process:
- Remove the sink and tub from the space, even though they will not be replaced with new ones. This manner, you are able to keep them clean and undamaged.
- Eliminate the tile, cleaning following it all surfaces: ceiling, walls, floor.
- Remove old paint from the walls, if they had been formerly painted, since the glue alternative or a new layer of paint will not adhere to surface.
Step 4: replacement of communications: pipes, electrical wiring.
Very often in an old house, you should carefully inspect and replace not just the pipes that are in the toilet itself, but also the principal riser, and on occasion the interfloor pipes. What’s it worth doing this? Old pipes at any time may give a leak, and then the new fix is going to be spoiled, it is going to require extra investment to get rid of defects.